IER-Zero-rated-Core-Engines-1280x1670.jpg

IER Zero rated Core Engines – Strategic stock and Cores read for installation or under overhaul  

  • 3 x TA1750 in Module form – read for rebuild of core engine.
  • 1 X TB5000 GG and Power Turbine Tested and complete.
  • 1 X TB5400 GG and Power Turbine Tested and complete.
  • 2 X TB5400 GG and Power Turbine under overhauling.
  • 3 x SGT-100 (5.0MW DLE /Conventional/MPI ) Tested and Complete.
  • 1 x SGT-100 (5.0MW Std Combustion ) Tested and Complete.
  • 1 x SGT-100 (5.25mw Conventional / MPI ) Tested and Complete.
  • 1 x SGT-200 GG and Power Turbines(6.45mw Twin/Single Shaft) Tested and complete.
  • 1 x SGT200 GG and Power Turbine 7.68MW Twin/Single Shaft) Tested and compete.
  • 1 x SGT-300 DLE (7.9mw) Gas Only Overhauled and complete ready for commissioning.
  • 2 x SGT-300 DLE (7.9MW) Dual Fuel Overhauled Low life time hours less than 500 ready for operation.
  • 1 x SGT-300 Std Combustion ( 7.9MW) Dual Fuel MPI Burners under overhauling.
  • 7 x GEC EAS1 Siemens Power Turbines serviceable and under overhauling.