Working hours:Mon - Fri   7.00am - 4:00pm Call Us: +971 4 883 0770
https://ierfzco.com/wp-content/uploads/2020/04/TB5400-overhauled-GG-1.jpg
https://ierfzco.com/wp-content/uploads/2020/04/TB5400-overhauled-GG-2.jpg
https://ierfzco.com/wp-content/uploads/2020/04/TB5400-overhauled-GG-3.jpg
https://ierfzco.com/wp-content/uploads/2020/04/TB5400-overhauled-GG-4.jpg
https://ierfzco.com/wp-content/uploads/2020/04/TB5400-overhauled-GG-5.jpg
https://ierfzco.com/wp-content/uploads/2020/04/TB-PT1-PT2-Stator-assembly-scaled.jpg
https://ierfzco.com/wp-content/uploads/2020/04/TB-overhauled-PT-Rotor.jpg

Fully Overhauled Gas Turbine TB5400 Cores GG & PT’s available

Title:

Description:

TB5400 overhauled GG-1
TB5400 overhauled GG-2
TB5400 overhauled GG-3
TB5400 overhauled GG-4
TB5400 overhauled GG-5
TB PT1 & PT2 Stator assembly
TB overhauled PT Rotor

Fully Overhauled Gas Turbine TB5400 Cores GG & PT’s available

IER Fully Overhauled & Zero Houred TB5400 core engines and Power Turbines Available either as direct supply or on an exchange basis. 18 months warrant along with Installation and Commissioning Services.
Category
Turbines
Manufacturer
Ruston / Siemens
Type
Core Engine ( GG )
Model
TB5400
Year
2020
Condition
Fully Overhauled Zero Houred
Price
POA
Quantity
3


© Copyright International Energy Resources 2002-2024. All rights reserved.