IER Fully Overhauled & Zero Houred TB5400 core engines and Power Turbines Available either as direct supply or on an exchange basis. 18 months warrant along with Installation and Commissioning Services.
IER Fully Overhauled & Zero Houred TB5400 core engines and Power Turbines Available either as direct supply or on an exchange basis. 18 months warrant along with Installation and Commissioning Services.
GE Frame 9E Transition Pieces PN 101E2571G003 Serviceable - Can be supplied fully refurbished and coated
Flender Frame 6B Gearbox Model TRL 65CV 50hz
Ruston Siemens TA gas turbine core engines and major capital parts and modules
Siemens - SGT100-200 & 300 (Allen Gearboxes 50 & 60Hz) - Fully Overhauled, supplied on an Exchange or Direct supply Basis. Complete with SS Clutch, Starting Device, Hydraulic Pump and High Speed Shaft.
GEC EAS1 Power Turbine capital parts available such as Power Turbine Rotors, Power Turbine Nozzle Assemblies, and Bearings etc
Siemens TA, TB and SGT Power Turbine and Compressor Rotors
Brand New SGT200 CT1 and CT2 Bladed Disc's with latest MAR M247 blades - Part No CT1 - RT31310B/09 & CT2 RT31320C/04
Siemens OEM CT2 Stator Assembly Brand New either as spare kit or full assembly.
Original Brand New OEM Power Turbine Rotors
© Copyright International Energy Resources 2002-2025. All rights reserved.